Home
About Us
Services
Preparing Project
Preparing Technical Specifications And Survey
Consulting Services
Consultant And Supervision Services
Training Services
Commitment Projects And Supervising
Projects
Ongoing Projects
Completed Projects
References
News
Contact Us
Completed Projects
TRAINING INCLUDES THE FOLLOWING TOPICS
Read more
TRAINING INCLUDES THE FOLLOWING TOPICS
CATENARY SYSTEM AND MAINTENANCE TRAINING FOR BASKENTRAY ELECTRIFICATION PROJECT (2018) / – ANKARA-TURKEY
Read more
CATENARY SYSTEM AND MAINTENANCE TRAINING FOR BASKENTRAY ELECTRIFICATION PROJECT (2018) / – ANKARA-TURKEY
ULUSOY ELECTRICITY CORPORATION / -TURKEY – LITHUANIA
Read more
ULUSOY ELECTRICITY CORPORATION / -TURKEY – LITHUANIA
KUMMLER MATTER LTD COMPANY (2016-2018) /- TURKEY
Read more
KUMMLER MATTER LTD COMPANY (2016-2018) /- TURKEY
DOĞUŞ HOLDING (2013-2018) /- TURKEY
Read more
DOĞUŞ HOLDING (2013-2018) /- TURKEY
KÖSEKÖY-SAPANCA RAILWAY LINE PROJECT – FOR TCDD
Read more
KÖSEKÖY-SAPANCA RAILWAY LINE PROJECT – FOR TCDD
İZMİR-ÇİĞLİ STATION RAILWAY LINE MODIFICATION PROJECT – FOR TCDD
Read more
İZMİR-ÇİĞLİ STATION RAILWAY LINE MODIFICATION PROJECT – FOR TCDD
IZMIR-TORBALI RAILWAY DEPOT LINES MODIFICATION PROJECT – FOR TCDD
Read more
IZMIR-TORBALI RAILWAY DEPOT LINES MODIFICATION PROJECT – FOR TCDD
ANKARA HIGH SPEED TRAIN STATION ELECTRIFICATION PROJECT – FOR TCDD
Read more
ANKARA HIGH SPEED TRAIN STATION ELECTRIFICATION PROJECT – FOR TCDD
RE-CONSTRUCTION WORK OF ARIFIYE-PAMUKOVA LINE – FOR TCDD
Read more
RE-CONSTRUCTION WORK OF ARIFIYE-PAMUKOVA LINE – FOR TCDD
YARIMCA-GEBZE THIRD LINE PROJECT – FOR TCDD
Read more
YARIMCA-GEBZE THIRD LINE PROJECT – FOR TCDD
KÖSEKÖY-YARIMCA THIRD LINE PROJECT – FOR TCDD
Read more
KÖSEKÖY-YARIMCA THIRD LINE PROJECT – FOR TCDD
CERKEZKOY-KAPIKULE CHANGE PANTOGRAPH PROJECT – FOR TCDD
Read more
CERKEZKOY-KAPIKULE CHANGE PANTOGRAPH PROJECT – FOR TCDD
TEPEKÖY-SELÇUK RAILWAY ELECTRIFICATION PRJECT FIRST LINE (2017) – SECOND LINE (2017-2018) – FOR TCDD / UNİTEK
Read more
TEPEKÖY-SELÇUK RAILWAY ELECTRIFICATION PRJECT FIRST LINE (2017) – SECOND LINE (2017-2018) – FOR TCDD / UNİTEK
BAŞKENTRAY RAILWAY PROJECT – FOR GÜLERMAK-KOLİN-ARMİN
Read more
BAŞKENTRAY RAILWAY PROJECT – FOR GÜLERMAK-KOLİN-ARMİN
CERKEZKOY-KAPIKULE HIGH SPEED TRAIN CATENARY SYSTEM OF PREPARATION OF BUDGET ESTIMATE, QUANTITY SURVEY AND PRICING(BQ) FILES – FOR ALARKO COMMITMENT GROUP
Read more
CERKEZKOY-KAPIKULE HIGH SPEED TRAIN CATENARY SYSTEM OF PREPARATION OF BUDGET ESTIMATE, QUANTITY SURVEY AND PRICING(BQ) FILES – FOR ALARKO COMMITMENT GROUP
CEYHAN-GUNYAZI-TOPRAKKALE MAIN LINE CATENARY SYSTEM OF PREPARATION OF BUDGET ESTIMATE, QUANTITY SURVEY AND PRICING FILES (BQ) – FOR ÇELİKLER AŞ
Read more
CEYHAN-GUNYAZI-TOPRAKKALE MAIN LINE CATENARY SYSTEM OF PREPARATION OF BUDGET ESTIMATE, QUANTITY SURVEY AND PRICING FILES (BQ) – FOR ÇELİKLER AŞ
MALATYA-NARLI RAILWAY ELECTRIFICATION RENOVATION PROJECT PREPARATION OF ELECTRIFICATION PROJECTS AND TECHNICAL SPECIFICATIONS – FOR TCDD 5. REGIONAL DIRECTORATE
Read more
MALATYA-NARLI RAILWAY ELECTRIFICATION RENOVATION PROJECT PREPARATION OF ELECTRIFICATION PROJECTS AND TECHNICAL SPECIFICATIONS – FOR TCDD 5. REGIONAL DIRECTORATE
ERZINCAN TRAMWAY PROJECT – FOR SENAZ
Read more
ERZINCAN TRAMWAY PROJECT – FOR SENAZ
BOYUKKESIK- GANJA- AZERBAIJAN RAILWAY (ADY) AC-DC ELECTRIFICATION SYSTEM CONVERSION PROJECT FOR 11 STATIONS AND 12 BETWEEN TWO STATIONS – FOR ATEF
Read more
BOYUKKESIK- GANJA- AZERBAIJAN RAILWAY (ADY) AC-DC ELECTRIFICATION SYSTEM CONVERSION PROJECT FOR 11 STATIONS AND 12 BETWEEN TWO STATIONS – FOR ATEF
BAKU-BOYUKKESIK / AZERBAIJAN RAILWAY PROJECT 3 KV DC SYSTEM TO 27,5 KV 50 Hz SYSTEM – FOR ATEF
Read more
BAKU-BOYUKKESIK / AZERBAIJAN RAILWAY PROJECT 3 KV DC SYSTEM TO 27,5 KV 50 Hz SYSTEM – FOR ATEF
ARKAS-YENICE LOGISTICS TERMINAL LINE AND JUNCTION LINE (2013-NOW) /- TURKEY
Read more
ARKAS-YENICE LOGISTICS TERMINAL LINE AND JUNCTION LINE (2013-NOW) /- TURKEY
ARKAS-SUADIYE LOGISTICS TERMINAL LINE (2013-NOW) /- TURKEY
Read more
ARKAS-SUADIYE LOGISTICS TERMINAL LINE (2013-NOW) /- TURKEY
ARKAS HOLDING (2013-NOW) /- TURKEY
Read more
ARKAS HOLDING (2013-NOW) /- TURKEY
CATENARY WITHIN THE SCOPE OF BASKENTRAY RAILWAY PROJECT RETURN AND EARTHING SYSTEM RENEWAL WORK – FOR ARMİN / ARMCO
Read more
CATENARY WITHIN THE SCOPE OF BASKENTRAY RAILWAY PROJECT RETURN AND EARTHING SYSTEM RENEWAL WORK – FOR ARMİN / ARMCO
KAZLICESME VE SARIGAZI METRO PROJECT – FOR METRO ISTANBUL / SENAZ
Read more
KAZLICESME VE SARIGAZI METRO PROJECT – FOR METRO ISTANBUL / SENAZ
ANTALYA-BURDUR RAILWAY LINE PREPARATION OF ALL ELECTRIFICATION PROJECTS AND TECHNICAL SPECIFICATIONS – FOR TCDD / PROYAPI / SENAZ
Read more
ANTALYA-BURDUR RAILWAY LINE PREPARATION OF ALL ELECTRIFICATION PROJECTS AND TECHNICAL SPECIFICATIONS – FOR TCDD / PROYAPI / SENAZ
MARMARAY – ISTANBUL / OHL TRACTION POWER SYSTEM VERIFICATION CONSULTANCY
Read more
MARMARAY – ISTANBUL / OHL TRACTION POWER SYSTEM VERIFICATION CONSULTANCY